The 2nd RDS was completed and handed over to the customer by end of 2020.

The design of Symetrica’s RPM is awesome and charming that allows the whole system being built at the site delightful.  

The structure of the 2nd RDS is strong enough against tough working conditions, both of extreme climate and super typhoons. The stability and performance of the second system with a robustness control are proven again.

This project was taken place during outbreak, but successfully completed on schedule. 

The system design is brilliant and the construction is rugged and delightful constructions and the operation of the system perform robust. 

The works got recognition that allow us to earn high reputation.   

It is another proven record of our capability in handling and managing engineering projects.

The second RDS
Click Here
THe second RDS
Click Here
The second RDS
Click Here
Previous slide
Next slide
Site inspection
Click Here
Site inspection
Click Here
Site inspection
Click Here
Previous slide
Next slide
Optic fibre
Click Here
Optic fibre
Click Here
Optic fibre
Click Here
Optic fibre
.
Click Here
Previous slide
Next slide
Cabling
Click Here
Cabling
Click Here
cabling
Click Here
Previous slide
Next slide
Installation
Click Here
Installation
Click Here
Installation
Click Here
Previous slide
Next slide